Project: Cumbria
Wind Energy Supplementary Planning Document
Dates: 2004-2006
Client: Cumbria
County Council
Context:
Government target that 20% of UK’s electricity generating capacity
should be supplied from renewable energy sources by 2020. Supports
policies set out in new Cumbria and Lake District Joint Structure
Plan 2001 – 2016. Replaces previous supplementary planning guidance
issued in 1997 with guidance suitable for third generation onshore
wind turbines up to 120m high and is being developed by seven local
planning authority partners.
Description:
Guidance on the landscape capacity to accommodate wind energy schemes
and the potential scale that would be appropriate lies at the heart
of this document. It is intended to set out a positive approach to
onshore wind energy development guiding it to the most appropriate
locations and ensuring that key characteristics and qualities of
Cumbria’s landscapes are safeguarded. Coates Associates were
initially asked to formulate a methodology and define sensitivity
criteria to assess both general capacity and the potential impacts of
individual proposals. Our approach to this started with the
collation of references and the review of current best practice in
capacity and impact assessment for wind energy development, it also
builds on the Cumbria Landscape Classification in which our landscape
director had a lead role and draws on our experience in assessing
current wind farm proposals. We worked closely with the client’s
lead landscape officer in developing a suitable methodology, piloting
it on two landscape types and making refinements before rolling it
out across a total of 14 landscape types. At the same time Coates
Associates updated the guidance for landscape and visual impact
assessment for individual developments to ensure that these are
comprehensive, of a consistent high standard, inform the design
process, and present illustrations in a legible and realistic manner.
Supplementary work was later commissioned with regard to guidance on
design and cumulative effects.
Services:
-
Preparation of Part
1 Guidance Chapters on Siting, Design and Cumulative Effects
-
Preparation of Part
2 Landscape Capacity Assessment
-
Preparation of Part
3 Landscape and Visual Impact Assessment Guidance
|